Viola Marshall
 A resurface of a ramp built 3+ years ago.
Old ramp deck removed, new deck applied.
End of ramp redone with more material making the surface stiffer.
Some of the foot rails replaced, all raised an additional 2 inches.
Deck in place, foot rails about to be applied.
Ramp finished, silicone caulk sealing cracks and allowed to dry.
Pre-paint.
Ramp deck painted in about 50 minutes.

Ramp's total deck surface: 27'
l